Hi,
We are planning to refresh our production BW on HANA system to a test system using DB copy method. Currently the production backup size is 1.6 TB, current memory usage is 1.1 TB & peak memory usage is 1.7 TB.
In the test system, we have only 1 TB memory. In order to do the HANA copy, do we need to uplift the memory? Or just the file system uplift to match the production HANA appliance would be sufficient?